The SA Water Sewer Construction Manual is available for free downloading. The documents are in PDF format and can be downloaded directly to a printer. The drawings are suitable for printing in either A4 or A3 format depending on user requirements and printer capabilities.
The Sewer Construction Manual (SCM) is based on the WSAA Sewerage Code of Australia (WSA 02-2002) which is the industry standard and must be purchased separately from WSAA (see WSAA information for further details). SA Water has some additional requirements which are detailed in the WSAA National Code Supplement.
The Corporation standards and SCM drawings cover the more detailed requirements and provide deemed to comply solutions.
The SCM is designed to be a three folder set consisting of:
-
WSAA Sewer Code of Australia (WSA 02-2002) with SA Water’s WSAA National Code Supplement interleaved for ease of use (see supplement introduction for details)
-
Sewer Construction Documentation Folder (A4 size) which includes sections covering:
The WSAA National Codes must be purchased separately and are available from WSAA (see WSAA information for further details).
WSAA Code Supplement

Corporate Codes and Standards
Note: TG 11(a) outlines SA Water's specific sewer pumping staion requirements, but if required, additional information is available
in the WSAA Sewage Pumping Station Code of Australia (WSA 04-2005)

Authorised Products

* Large file sizes, please be patient when downloading