Technical Notes are provided on an as required basis and cover details of new products, technical information and suggested construction methods.
Requests or suggestions for items to be covered in future issues of Technical Notes should be forwarded to:
Infrastructure Standards Unit
GPO Box 1751
Adelaide SA 5001.
* Large filesizes, please be patient when downloading