Standard Drawings

Electrical

Drawing No.TitleResponsibleRevisionCurrent Status
N/A

Cable Schedule Template

Principal Engineer Electrical

1

Current Edition

Mechanical and Hydraulics

Drawing No.TitleResponsibleRevisionCurrent Status

4003-00001-01

Process and Instrumentation Diagram Standard Drafting Symbols Chart - Sheet 1 of 2

Manager Mech. & Hydraulics (M Stephens)

1

Current Edition

4003-00001-02

Process and Instrumentation Diagram Standard Drafting Symbols Chart - Sheet 2 of 2

Manager Mech. & Hydraulics (M Stephens)

1Current Edition

Material Science

Drawing No.TitleResponsibleRevisionCurrent Status
4004-00001Cathodic Protection Standard DrawingsPrincipal Engineer Material ScienceMultipleCurrent Edition

`

Reticulation Networks

Water Supply Construction Manual Drawings

Drawing No. TitleResponsibleRevision Current Status
4005-30001 Index Principal Engineer Reticulation Networks Multiple Current Edition
4005-30002 General Information & Preferences Principal Engineer Reticulation Networks Multiple Current Edition
4005-30003 Excavation Embedment & Trenching Principal Engineer Reticulation Networks Multiple Current Edition
4005-30004 Allocation of Space for Services Principal Engineer Reticulation Networks Multiple Current Edition
4005-30005 Mainlaying Principal Engineer Reticulation Networks Multiple Current Edition
4005-30006 Water Connections Principal Engineer Reticulation Networks Multiple Current Edition
4005-30007 Access Chambers & Marker Posts Principal Engineer Reticulation Networks Multiple Current Edition
4005-30008 Meter Assemblies Principal Engineer Reticulation Networks Multiple Current Edition
4005-30009 Fire Services Principal Engineer Reticulation Networks Multiple Current Edition
4005-30010 Miscellaneous Principal Engineer Reticulation Networks Multiple Current Edition

Sewer Construction Manual Drawings

Drawing No. TitleResponsibleRevision Current Status
4005-20001 Index Principal Engineer Reticulation Networks Multiple Current Edition
4005-20002 General Information & Preferences Principal Engineer Reticulation Networks Multiple Current Edition
4005-20003 Excavation Embedment & Trenching Principal Engineer Reticulation Networks Multiple Current Edition
4005-20004 Allocation of Space for Services Principal Engineer Reticulation Networks Multiple Current Edition
4005-20005 Maintenance Structures Principal Engineer Reticulation Networks Multiple Current Edition
4005-20006 Sewer Connections Principal Engineer Reticulation Networks Multiple Current Edition
4005-20007 Trunk Sewers Principal Engineer Reticulation Networks Multiple Current Edition
4005-20008 Miscellaneous Principal Engineer Reticulation Networks Multiple Current Edition

Sewage Pump Station Drawings

Drawing No. TitleResponsibleRevision Current Status
4005-40001 Standard Submersible Sewage Pumping Stations  Principal Engineer Reticulation Networks N/A Under Development (see below)
94-0163 Standard Submersible Sewage Pumping Stations Principal Engineer Reticulation Networks Multiple Current Edition

  • Major faults

  • Reported

  • East Tce
  • Kadina
  • 26/04/2018
  • Water On
  • 26/04/2018 10:25 AM - We are on-site responding to an incident in Kadina. Water should now be back on. Our crews may remain on site to perform further work. Traffic restrictions may also apply. Reference Number WO: 06324249.
  • See all major faults

  • Scheduled works

  • Underway
  • Ferrers St
  • Mount Gambier
  • 27/04/2018
  • Supply Interruption
  • Estimated start time (water off): 30/04/2018 09:00 AM
    Estimated restore time (water back on): 30/04/2018 10:30 AM

    We’re committed to improving your services and are undertaking maintenance work in Mount Gambier. Water supply in the surrounding area may be impacted during the above times. Traffic restrictions may also apply.


  • See all scheduled works