River Murray reports: daily flow

River Murray reports: daily flow

All monitoring stations measure river height, not flow in the river. A rating table is used at each site to estimate the flow in the river based on the height of the river. These rating tables are compiled from measurements taken over time and at a range of heights.

Given how long it is since river heights of the current magnitude have been seen, there is considerable uncertainty at the higher end of these ratings tables for all gauges.

For the latest estimated daily flow forecast, visit the Department for Environment and Water website.

The Department for Environment and Water also issues a weekly River Murray Flow Report. River Murray Flow Reports contain information about water levels, flow rates and barrage operations as well as any navigation issues and construction activities. When the flow rate at the South Australian border exceeds 40 gigalitres/day, these reports will also include River Murray High Flow Advice. Visit the Water Connect website for more information.

Additionally, there is further information available via an interactive page on the Murray-Darling Basin Authority website. This tracks water flow rates, release rates and river heights across the River Murray system and its tributaries.

We produce daily reports of the state of the River Murray. These include daily flow, salinity level and rain reports.

Daily flow reports

This data shows flow rates recorded at monitoring stations along the River Murray. Information is updated daily. It is also available in graph form.

ThursdayFridaySaturdaySundayMondayTuesdayWednesday
11/09/202512/09/202513/09/202514/09/202515/09/202516/09/202517/09/2025
Wakool Level (m)2.932.932.912.892.822.742.69
Wakool Flow (ML/Day)7401740173217242696766576466
Boundary Bend Level (m)2.092.092.092.12.0621.96
Boundary Bend Flow (ML/Day)8590859085908640844081427944
Lock 15 Upstream Level (m)47.3347.3447.3447.3547.3547.3247.32
Lock 15 Downstream Level (m)43.4643.4543.4843.4743.4743.4543.4
Lock 15 Flow (ML/Day)7969791380808024802479137643
Lock 11 Upstream Level (m)34.4334.4334.4334.4334.4334.4334.43
Lock 11 Downstream Level (m)31.0431.0331.0231.0231.0231.0231.02
Lock 10 Upstream Level (m)30.8430.8330.8330.8330.8330.830.82
Lock 10 Downstream Level (m)28.0528.0728.0528.0428.0328.0328.05
Lock 10 Flow (ML/Day)13593141591415914159141591356913961
Lock 9 Upstream Level (m)27.26427.27327.26827.26227.25527.24621.275
Lock 9 Downstream Level (m)24.84324.8524.84624.83824.83224.82724.883
Lock 9 Flow (ML/Day)11336115031141011299111701100511540
Lock 8 Upstream Level (m)24.62424.62924.6324.62624.62124.61724.667
Lock 8 Downstream Level (m)22.54122.51322.51322.50622.49822.48822.538
Lock 7 Upstream Level (m)22.16722.11422.11422.10822.10422.08722.151
Lock 7 Downstream Level (m)21.47321.40221.41521.40721.41621.31921.241
Mullaroo Flow (ML/Day)1057104610681090110111011145
Lake Victoria Inflow (ML/Day)2852324335183515351833272775
Lake Victoria Level (m)25.9825.9525.9425.9325.9225.925.9
Lake Victoria Storage (ML)555973.2552543551401.2550260.3549120.2546842.6546842.6
Lake Victoria Outflow (ML/Day)4523342736633671386629972758
Downstream of Rufus River Level (m)4.534.464.484.474.484.384.3
Downstream of Rufus River Flow (ML/Day)13510129561311313034131131234111745
Lock 6 Upstream Level (m)19.31919.29919.28719.28419.28519.31719.315
Lock 6 Downstream Level (m)16.7516.87116.85616.85116.84516.79516.779
Lock 5 Upstream Level (m)16.3516.38916.36316.35816.35416.3616.373
Lock 5 Downstream Level (m)13.67813.80113.88313.89413.89213.83813.834
Lock 5 Flow (ML/Day)10422124531291012800127131182511591
Berri Level (m)13.38213.45113.50713.52813.52813.5113.516
Lock 4 Upstream Level (m)13.36813.43213.48613.50713.51213.49513.499
Lock 4 Downstream Level (m)10.84710.98211.10211.15211.16311.10511.053
Loxton Level (m)10.333
Lock 3 Upstream Level (m)9.839.859.8729.8819.8979.879.846
Lock 3 Downstream Level (m)6.6336.676.7676.8936.9397.0056.976
Waikerie Level (m)6.63
Lock 2 Upstream Level (m)6.2986.3246.3756.4436.4766.4766.468
Lock 2 Downstream Level (m)3.63.6293.6713.7643.8083.8833.891
Lock 1 Upstream Level (m)3.2773.2813.2673.2933.2853.2543.259
Lock 1 Downstream Level (m)1.0090.9750.9680.9470.9561.0911.174
Lock 1 Flow (ML/Day)78368910957410311115701260912761
Swan Reach Level (m)0.9930.9370.9020.8670.8260.9311.025
Mannum Pump Station Level (m)0.8630.8730.820.7890.7560.8550.894
Murray Bridge Level (m)0.8380.8490.8030.7720.7610.80.845
Flow to S.A (ML/Day)14317137521393113874139641319212640
Flow this Report (ML)95670
Flow This Month (ML)181655
Flow Last Month (ML)230013
BarragesLevelGates
Goolwa0.7481
Mundoo0.7990
Boundary Creek0.7990
Ewe Island0.7990
Tauwitcherie0.81416
Pool Levels
RelativesUpstream Level (m)Downstream Level (m)
Lock 9-6.1250.283
Lock 80.0670.438
Lock 70.0511.991
Lock 60.0650.479
Lock 50.0730.634
Lock 40.2991.253
Lock 30.0460.876
Lock 20.3680.691
Lock 10.0590.424

  • Major faults

  • Underway

  • Polkinghorns Rd
  • Arthurton
  • 18/06/2020
  • Water Supply On
  • 18/06/2020 03:05 PM - We are attending to an incident in Arthurton with no interruption to the water supply. The safety of our crews and customers comes first, and we always aim to minimise inconvenience by restoring services as quickly as we can. Reference Number WO: 07505663.
  • See all major faults

  • Scheduled works

  • Underway
  • Spruance Rd
  • Elizabeth East
  • 11/06/2021
  • Temporary Supply Interruption
  • Estimated start time and water supply off: 15/06/2021 09:00 AM
    Estimated restore time and water supply back on: 15/06/2021 04:00 PM

    We’re improving your services and undertaking maintenance work in Elizabeth East. Sometimes our crews need to temporarily interrupt the water supply to our customers and/or manage traffic while they are working. Temporary traffic management may remain in place until reinstatement of the impacted road is complete. We always aim to minimise inconvenience by restoring services as safely and quickly as we can.


  • See all scheduled works