Consultant engineers
We are currently not accepting new applications for consultant accreditation. Please refer to Consultants Accreditation Rating List for authorised consultants details.
Accredited Consultants
Infrastructure installed by means of a Land Developer Agreement must be designed by a consultant engineer approved by us.
- Consultants Accreditation Rating List - Version 3.0 (July 2025)
Consultant Accreditation Information
SA Water manages its Accredited Consultants and Accredited Superintendents in accordance with the process defined in TS 0104, which is available on our Technical Standards page.
Design Guidelines
The following design guidelines are to be complied with in the preparation of designs for Land Development:
- MLD Safe Design Management Plan – Version 1.0 (April 2022)
- Water Limit of Contract Notes – Version 2.1 (October 2018)
- Water Example
- Sewer Limit of Contract Notes – Version 2.0 (November 2016)
- Sewer Example
- Drawing Templates – (December 2017)
As Constructed Guidelines