Size

Connection

Meter

Connection with Meter

20mm**

$2,269

$260

$2,529

25mm**

$3,072

$461

$3,533

40mm**

$4,073

$815

$4,888

50mm**

$5,110

$1,881

$6,991

>50mm

Estimated cost to deliver service

Permanent overhead standpipe and meter

Estimated cost to deliver service

** Charge is for standard connections only. Please refer to the Connections Policy for non-standard connections.

Recycled water meters are only available in 20mm and 50mm.


Manifold connections

Manifold connections (provision of multiple water meters to strata/community title developments using a manifold connection). These fees do not include the connection cost.

Up to twelve 20mm water meters (residential)

$361 per water meter

Up to five 25mm water meters (commercial/industrial)

$550 per water meter

Provide and install Metal Underground Box to cover Water Meter

Metal underground box to cover 20mm or 25mm water meter

$686

Metal underground box to cover 40mm or 50mm water meter

$1,935

Shortening metered water connection – 20mm or 25mm into an underground box

$1,732

Shortening metered water connection – 32mm to 50mm into an underground box

$3,234

Altering an existing water meter and/or connection

Disconnection of water connections 50mm or less

$677

Disconnection of water connections over 50mm

Estimated cost to deliver service

Temporary water meter removal (Connection remains)

$124

Shortening water connection – 20mm or 25mm

$1,046

Shortening water connection – 32mm to 50mm

$1,299

Raise or lower water connection – 15mm to 20mm

$779

Raise or lower water connection – 25mm to 50mm

$1,256

Rotation – 20mm and 25mm water meter up to 180 degrees

$190

Rotation – 40mm water meter up to 180 degrees

$775

Water Relocations

Relocate a 20mm or 25mm metered water connection 4 metres or less

0.1m – 2.0m

$714

> 2.0m – 4.0m

$826
Relocate a 20mm or 25mm unmetered water connection 4 metres or less and installation of a water meter

0.1m – 2.0m

$882

> 2.0m – 4.0m

$994

Relocate a 20mm or 25mm unmetered water connection more than 4 metres and installation of a water meter

(Metered Connection Fee + Disconnection Fee)

20mm meter

$3,206

25mm meter

$4,210
Relocate a 20mm or 25mm metered water connection more than 4 metres

(Connection Fee + Disconnection Fee)

20mm meter

$2,946

25mm meter

$3,749
Relocate a 40mm or 50mm metered water connection any distance

(Connection Fee + Disconnection Fee)

40mm meter

$4,750

50mm meter

$5,787

>50mm meter

Estimated cost to deliver service


Fire Connection Requirements

Fire Connections / Disconnections / Isolation ValvesEstimated cost to deliver service

Sewerage Connection

100mm **$4,661
100mm Spur Connection$2,743
100mm "Y" Spur Connection (Connection Fee + Spur Connection Fee)$7,404
150mm **$8,095
>150mmEstimated cost to deliver service
Disconnection - 100mm and 150mm$1,099
Disconnection >150mmEstimated cost to deliver service


** Charge is for standard connections only. Please refer to the Connections Policy for non-standard connections.


Sewerage Pre-laid Application Fee

100mm *$55
150mm *$55

* GST applies to the Wastewater Application Fee only.


Sewerage Relocations

Insert inspection point – 100mm and 150mm

Estimated cost to deliver service

Relocation 100mm (Connection Fee + Disconnection Fee)

$5,760

Relocation 150mm (Connection Fee + Disconnection Fee)

$9,194


Metered Hydrant

Metered Hydrant Application*

$221

Metered Hydrant Deposit – 25mm

$500

Metered Hydrant Deposit – 50mm

$650

Hire of Portable Hydrant

$110 per quarter

Breach of Terms and Conditions of hire of Hydrant

$163

* GST has been applied to these charges


Design and Administration Fees

Design and administration charge for estimated connections*

$302

Design and administration charge for mains extensions*

$951

* GST has been applied to these charges

Miscellaneous

Service Rent
Applicable where this is more than one meter under one account.
$74.45 per quarter
Flow test - fire plug$145
Flow Test – additional fire plug (This fee will only apply if this test is conducted on the same day at the same site)$27.00
Network Analysis*$440
Service Fee*$57.00 per hour
Meter Lock
Locks meter tap in the open position (Avaliable from SA Water, 250 Victoria Square, Adelaide).
$34.25

* GST has been applied to these charges


Augmentation Charges

Augmentation charges also apply in designated areas throughout the state.

  • Major faults

  • Underway

  • Stephen Tce
  • St Peters
  • 16/11/2018
  • Water Supply On
  • 17/11/2018 05:03 AM - We are attending to an incident in St Peters with no interruption to the water supply. The safety of our crews and customers comes first, and we always aim to minimise inconvenience by restoring services as quickly as we can. Reference Number WO: 06653006.
  • See all major faults

  • Scheduled works

  • Underway
  • Ronda Av
  • Roseworthy
  • 17/11/2018
  • Temporary Supply Interruption
  • Estimated start time and water supply off: 19/11/2018 08:00 AM
    Estimated restore time and water supply back on: 19/11/2018 03:00 PM

    We’re improving your services and undertaking maintenance work in Roseworthy. Sometimes our crews need to temporarily interrupt the water supply to our customers and/or manage traffic while they are working. Temporary traffic management may remain in place until reinstatement of the impacted road is complete. We always aim to minimise inconvenience by restoring services as safely and quickly as we can.


  • See all scheduled works

Follow Us On