Technical guidelines

Technical guidelines

Technical guidelines inform the designer of principles and practices to be applied to the construction and modification of our assets.

Guidelines cover the design of particular types of infrastructure (such as pumping stations) as well as systems (such as electrical and computer-based) and are applicable to all infrastructure types. It is intended that technical guidelines form part of the project contract documentation and the principles and practices they specify are contractually binding upon designers and constructors.

01 - General

Responsible: Refer to Document Control Page of Standard
Legacy Number
New Number
Title
Version
TG 110 N/A Safety In Design 1.0

02 - Mechanical & Hydraulics

Responsible: Principal Engineer, Mechanical & Hydraulics  - Gordon Holmes
Legacy Number
New Number
Title
Version
TG 32 N/A Hydraulic Aspects of Pumping and Gravity Mains 1.0

03 - Electrical

Responsible: Principal Engineer, Electrical - Justin Hamra
Legacy
Number
New
Number
Title
Version
    

05 - Reticulation Networks

Responsible: Principal Engineer, Reticulation Networks - Tom Galek
Legacy Number
New Number
Title
Version
TG 11a N/A The Design Of Sewerage Systems (Extract Of Par 4 And 5) 1.0

06 - Civil

Responsible: Principal Engineer, Civil & Structural - Hany Habib
Legacy
Number
New
Number
Title
Version
TG 96 N/A
The Design Of Anchors And Thrust Blocks On Buried Pipelines
With Unrestrained Flexible Join And For The Anchorage Of Pipes On Steep Grades
1.0
TG 104 N/A Design Of Pipe End Dissipaters 1.0

06 - Civil (Geotechnical)

Responsible: Principal Engineer, Dams and Geotechnical - Moji Kan
Legacy
Number
New
Number
Title
Version
N/A TG 0631 General Technical Information for Geotechnical Design - Earthworks 2.0
N/A TG 0632
General Technical Information for Geotechnical Design - Compaction
2.0
N/A TG 0633 General Technical Information for Geotechnical Design - Coarse Geomaterials in Civil Works 2.0
N/A TG 0634 General Technical Information for Geotechnical Design - Soil Testing 2.0
N/A TG 0635 General Technical Information for Geotechnical Design - Permeability 2.0
N/A TG 0636 General Technical Information for Geotechnical Design - Lined Storages 2.0
N/A TG 0637 General Technical Information for Geotechnical Design - Pipelines 2.0
N/A TG 0638 General Technical Information for Geotechnical Design - Hydrogeology 2.0
N/A TG 0639 General Technical Information for Geotechnical Design - Piles 2.0
N/A TG 0640 General Technical Information for Geotechnical Design Part M - Survey Pillars 2.0
N/ATG 0641General Technical Information for Geotechnical Design - Earth Dams2.0

07 - Structural

Responsible: Principal Engineer, Civil & Structural - Hany Habib
Legacy
Number
New
Number
Title
Version
TG 106 N/A Above Ground Circular Concrete Tanks 1.0

  • Major faults

  • Underway

  • Polkinghorns Rd
  • Arthurton
  • 18/06/2020
  • Water Supply On
  • 18/06/2020 03:05 PM - We are attending to an incident in Arthurton with no interruption to the water supply. The safety of our crews and customers comes first, and we always aim to minimise inconvenience by restoring services as quickly as we can. Reference Number WO: 07505663.
  • See all major faults

  • Scheduled works

  • Underway
  • George St
  • Green Fields
  • 29/10/2020
  • Temporary Supply Interruption
  • Estimated start time and water supply off: 01/11/2020 09:00 AM
    Estimated restore time and water supply back on: 01/11/2020 06:00 PM

    We’re improving your services and undertaking maintenance work in Green Fields. Sometimes our crews need to temporarily interrupt the water supply to our customers and/or manage traffic while they are working. Temporary traffic management may remain in place until reinstatement of the impacted road is complete. We always aim to minimise inconvenience by restoring services as safely and quickly as we can.


  • See all scheduled works